  • To ensure that a newly acquired laboratory instrument is installed, verified and commissioned following the qualification protocols required by sector regulations (pharmaceutical, food, cosmetic, environmental), documenting that the equipment performs according to the manufacturer’s specifications before entering routine use.
  • Labcare365’s technical team handles unpacking, assembly and setup of the instrument, and executes the IQ (Installation Qualification), OQ (Operational Qualification) and PQ (Performance Qualification) protocols: verifying that the installation meets the manufacturer’s conditions, that the equipment operates correctly across its full operating range, and that its performance remains consistent under real working conditions. Laboratory staff are trained in operating the equipment from day one.
  • Equipment operational from the very first moment, with no learning curve for the client.
  • Qualification documentation ready for audits and inspections (AEMPS, ISO 17025, GMP).
  • Reduced risk of analytical errors caused by faulty installation or initial calibration.
  • Saves internal time: laboratory staff don’t need to interpret complex technical manuals.
  • Documented traceability from day zero of the equipment’s life cycle.